Queue plan, 2026-11

Status: 🟢 Built. The re-planned queue (2026-11-24): its Now list, gates and Later counts come from governance/queue.json, which tests and fitness hold. What the lights mean

The owner approved a re-plan of governance/queue.json on 2026-11-24. Dates had been set one at a time and never checked against what the builders can merge (about 8 to 10 changes a day). Now every open ask has a score, a place and a date that fits.

How it works. Score = risk x reach / effort, each 1 to 5, stored as rre. Hard gates (no single point of failure, security, recoverability, legal before launch) come first whatever the score (gate). Builders get 8 slices of work a day (effort + 1 slices per item). Asks only the owner can finish carry needs: owner, with a soft date. Everything else has a horizon and due set to that period's last day.

Counts. 208 open before, 33 merged away, 175 open now: 58 Now (28 gates + top 30), 55 in 2027-Q1, 55 in 2027-Q2, 7 later. 24 need the owner.

Now, in order (2026-11-25 to 2026-12-20)

No single point of failure and 24x7 (gates, first):

  1. routine-repo-attach 11-25: the daily build routine never starts blind.
  2. second-static-host 11-25: the site and apps stay up if one host fails.
  3. ci-download-resilience 11-25: a GitHub download error no longer turns CI red.
  4. delegate-reliability 11-26: delegated builds finish, with less Claude.
  5. chat-history-shared 11-26: a chat survives the machine it began on.
  6. autobuild-ci-key 11-28 (owner): builds keep running after a session ends.
  7. open-model-second-provider 11-30 (owner): one builder outage no longer stops work.
  8. gitlab-mirror 12-02 (owner): the code has a second home.
  9. builder-no-money-spof 12-04 (owner): builders stay up when one plan or credit runs out.
  10. always-on-real-vps 12-06 (owner): sync and access work with the laptop off.
  11. off-paid-claude 12-08 (owner): building does not depend on paid Claude.

Security and recoverability (gates):

  1. ai-gap-g14 11-27: the audit trail survives restarts, anchored daily.
  2. app-lock 11-27: private details stay behind the lock.
  3. pin-actions-by-commit 11-28: build steps cannot be swapped under us.
  4. ai-gap-g9 11-28: provider keys leave plain text.
  5. soc-auth-refusal-alerts 11-29: a forged key or refused caller raises an alert.
  6. own-origin-hosting 11-29: apps get proper security headers.
  7. ref-bar-supply-chain 11-30: signed releases with an SBOM.
  8. threat-models-by-risk 12-01: the riskiest parts are threat-modelled.
  9. golive-first-run 12-10 (owner): the go-live runbook proven on real machines.

Legal before launch (gates):

  1. third-party-notices 12-01: bundled software is credited properly.
  2. privacy-notice 12-02: a published privacy notice, disclaimers and the education line.
  3. abuse-coercive-setup 12-02: the apps cannot easily be used to spy on someone.
  4. launch-owner-attests 12-12 (owner): the two launch confirmations only the owner can give.
  5. name-clearance 12-14 (owner): the name and trademark are clear to use.
  6. liability-cover 12-16 (owner): indemnity cover and capped contract liability.
  7. licence-review 12-18 (owner): what is sold matches each licence.
  8. paid-terms 12-20 (owner): published terms, GDPR scope and the paid-advice line before anyone pays.

Top 30 by score:

  1. build-freeze-live-first 12-03: time to live with the apps, not only build.
  2. github-api-backoff 12-03: busy rounds stop tripping GitHub limits.
  3. dependabot-round 12-03: waiting security updates are handled.
  4. open-model-budget 12-04: the monthly builder cap is not spent in a day.
  5. audit-round-1 12-04: safety, correctness and real-day audits, one ask.
  6. owner-frictions-goals-ask 12-05: Goals and Ask stop annoying.
  7. one-open-action-2 12-05: one clear next step on every screen.
  8. validation-rest 12-06: impossible numbers are refused everywhere.
  9. contradiction-guard 12-06: contradictory answers are caught.
  10. essentials-first 12-07: the person knows the few values that matter.
  11. keys-in-command-center 12-07: no terminal to add AI keys.
  12. wsl-user-without-opening-ubuntu 12-08: Windows install needs no Ubuntu step.
  13. explainer-own-fonts 12-08: the tour works offline.
  14. calendar-subscribe 12-08: deadlines reach the calendar by themselves.
  15. spend-guard 12-09: rupee caps on AI cost.
  16. estate-gap-gates 12-09: the remaining gap classes get a gate.
  17. setup-one-command 12-10: one command to set up a machine.
  18. deterministic-backbone 12-11: code decides, AI proposes.
  19. delivery-four-keys 12-11: delivery measured in progress.
  20. ip-contributor-terms 12-12: outside work is licensed cleanly.
  21. codex-builder-trial 12-12: a trial of one more builder.
  22. life-papers-first-import 12-13: private papers read into the Life OS.
  23. enterprise-sweep-components 12-14: the five-lens review of every component.
  24. life-papers-upload 12-15: upload papers from the phone.
  25. ai-gap-g15 12-15: retrieval respects document owner and class.
  26. ai-gap-g3 12-16: tool calls wait for approval.
  27. pr-321-review 12-16: a stuck review ledger slice settled.
  28. trust-pack 12-17: a trust page and questionnaire pack.
  29. ai-install 12-17: install by pasting one sentence.
  30. calm-and-real 12-18: calmer, truer lock-screen visuals.

Owner actions

Gates above with (owner), plus these 12 later asks: commercial-lead, owner-github-settings, one-door-primary-identity, door-access-bypass, licence-holder-company, discovery-30-days, cloud-seedbank-first-apply, signed-official-content, multilingual-review, real-phone-check, site-on-own-domain, store-submission. Builders prepare the rail and the exact step first, then the owner does the account, money or legal part. Dates on these are soft.

Merges (survivor, then the asks folded into it)

  • design-premium-review: luxury-standard, maison-finish, world-class-pass, visual-standard-v2, lux-real-polish
  • audit-round-1: audit-round-2, audit-round-3, 360-audit-rounds, test-campaign-2, kaizen-2
  • ai-gap-g6: ai-gap-g7; spend-guard: ai-gap-g16
  • one-door-accounts-panel: one-door-aws-federation, one-door-drive-consent
  • privacy-notice: disclaimers, sebi-education-line; paid-terms: gdpr-scope, sebi-paid-opinion
  • multilingual: launch-languages, i18n-quality; multilingual-review: language-pro-review; global-ready-rail: rtl-ready
  • name-clearance: ip-trademark; threat-models-by-risk: paid-threat-model
  • easy-start: start-simple-2; wheel-systems: life-systems, systems-not-theory, instructions-to-systems
  • felt-vs-measured: measured-not-scored; expert-council: profession-packs
  • calendar-subscribe: deadlines-in-calendar; model-trust-routing: open-weight-lab; nature-atlas: nature-elements-2

Later

Horizon Open asks Due field
2027-Q1 55 2027-03-31
2027-Q2 55 2027-06-30
later 7 2027-12-31

Rule for the next session: take the top of Now; when it is empty, pull the highest-scoring 2027-Q1 asks forward. Re-run this plan monthly.